Master Equipment Matrix
Draft v3Fab 4 Expansion — 45 items across 7 systems · 13 discipline groups
Equipment
45
Connected Load
5.8 MW
Total FLA
5,581
Submittals Approved
25/45
Overdue
2
45 of 45 rows
Mec
Str
Electrical(20)
Pro
Com
Gas
Nat
RO/
Was
Ins
Int
Schedule & Procurement(5)
POC Tag
Description
Area Class
Voltage
Phase
Panel/Direct
Freq (Hz)
Conn Load (kW)
Oper Load (kW)
FLA
MCA
MOCP
Start Method
VFD
NEMA
Conn Type
Cable Size
Prot Device
Prot Rating
UPS
Schedule Link
Submittal
PO Status
Delivery Date
Install Date
EP-LIT-001
EUV Scanner Main Power
Unclass
4160V
3
Direct
60
1400
1050
218
272
300
Soft Start
12
Hard-wired
4/0 AWG
MCCB
300A
A3010 – Install EUV Litho
In Review
Awarded
2026-09-15
2026-11-01
EP-LIT-001A
—
—
480V
3
—
60
350
280
480
—
—
VFD
—
—
—
—
—
A3011 – Install EUV Source
Approved
Awarded
—
—
EP-LIT-001B
—
—
208V
3
—
—
15
—
42
—
—
—
—
—
—
—
—
A3012 – Install Reticle Handler
Approved
Awarded
—
—
EP-LIT-001C
—
—
480V
3
—
—
85
—
119
—
—
—
—
—
—
—
—
A3013 – Install EUV Vacuum
Pending
Awarded
—
—
EP-LIT-002
—
—
480V
3
—
60
180
140
252
—
—
—
—
—
—
—
—
A3020 – Install DUV Scanner
Approved
Awarded
2026-07-01
2026-08-15
EP-LIT-003
—
—
480V
3
—
—
95
70
133
—
—
—
—
—
—
—
—
A3030 – Install Coater/Dev
Approved
Awarded
2026-07-15
2026-09-01
EP-CMP-001
—
—
480V
3
—
60
85
65
120
150
175
VFD
—
Hard-wired
—
—
—
A1040 – Install CMP #1
Approved
Awarded
2026-05-01
2026-06-15
EP-CMP-001A
—
—
208V
1
—
—
5
—
14
—
—
—
—
—
—
—
—
A1041 – Install Slurry Delivery
Approved
Awarded
—
—
EP-CMP-002
—
—
480V
3
—
—
85
65
120
—
—
—
—
—
—
—
—
A1045 – Install CMP #2
Approved
Awarded
2026-05-15
2026-07-01
EP-CMP-003
—
—
480V
3
—
—
45
—
63
—
—
—
—
—
—
—
—
A1050 – Install Post-CMP Clean
In Review
Awarded
—
—
EP-MET-001
—
—
208V
3
—
—
12
—
34
—
—
—
—
—
—
—
—
A1060 – Install Surfscan
Pending
Not Started
—
—
EP-CVD-001
—
—
480V
3
—
60
120
90
168
—
—
—
—
—
—
—
—
A2010 – Install PECVD #1
Approved
Awarded
2026-06-01
2026-07-20
EP-CVD-001A
—
—
480V
3
—
—
25
—
35
—
—
—
—
—
—
—
—
A2011 – Install RF Gen
Approved
Awarded
—
—
EP-CVD-002
—
—
480V
3
—
—
95
—
133
—
—
—
—
—
—
—
—
A2020 – Install ALD Chamber
Pending
Pending
2026-08-01
—
EP-CVD-003
—
—
480V
3
—
—
105
—
147
—
—
—
—
—
—
—
—
A2030 – Install Lam PECVD
Pending
Draft
—
—
EP-CVD-ABT-001
—
—
480V
3
—
—
30
—
42
—
—
—
—
—
—
—
—
A2040 – Install CVD Abatement
Approved
Awarded
—
—
EP-ETCH-001
—
—
480V
3
—
60
110
80
154
—
—
—
—
—
—
—
—
A4010 – Install Conductor Etch
Approved
Awarded
2026-06-15
2026-08-01
EP-ETCH-001A
—
—
208V
1
—
—
3
—
8
—
—
—
—
—
—
—
—
A4011 – Install Turbo Pump
Approved
Awarded
—
—
EP-ETCH-002
—
—
480V
3
—
—
105
—
147
—
—
—
—
—
—
—
—
A4020 – Install Dielectric Etch
Pending
Draft
2026-09-01
—
EP-ETCH-003
—
—
480V
3
—
—
95
—
133
—
—
—
—
—
—
—
—
A4030 – Install TEL Etch
Overdue
Pending
—
—
EP-ETCH-004
—
—
480V
3
—
—
70
—
98
—
—
—
—
—
—
—
—
A4040 – Install Strip System
Not Required
Not Started
—
—
EP-ETCH-005
—
—
480V
3
—
—
60
—
84
—
—
—
—
—
—
—
—
A4050 – Install Wet Etch
Pending
Draft
—
—
EP-IMP-001
—
—
480V
3
—
60
200
155
280
—
—
—
—
—
—
—
—
A5010 – Install HC Implanter
Approved
Awarded
2026-07-15
2026-09-01
EP-IMP-001A
—
—
208V
—
—
—
12
—
34
—
—
—
—
—
—
—
—
A5011 – Install End Station
Approved
Awarded
—
—
EP-IMP-002
—
—
480V
3
—
—
250
190
350
—
—
—
—
—
—
—
—
A5020 – Install HE Implanter
In Review
Awarded
2026-08-01
—
EP-IMP-003
—
—
480V
3
—
—
150
—
210
—
—
—
—
—
—
—
—
A5030 – Install MC Implanter
Not Required
Not Started
—
—
EP-DIFF-001
—
—
480V
3
—
—
65
—
91
—
—
—
—
—
—
—
—
A6010 – Install Vertical Furnace
Approved
Awarded
2026-05-15
2026-07-01
EP-DIFF-002
—
—
480V
3
—
—
75
—
105
—
—
—
—
—
—
—
—
A6020 – Install RTP System
Pending
Not Started
—
—
EP-DIFF-003
—
—
480V
3
—
—
55
—
77
—
—
—
—
—
—
—
—
A6030 – Install Spike Anneal
Pending
Not Started
—
—
EP-UTL-001
—
—
4160V
3
—
60
350
280
54
—
—
VFD
—
Hard-wired
1/0 AWG
—
—
A8010 – Install Chiller #1
Approved
Awarded
2026-04-01
2026-05-15
EP-UTL-001A
—
—
4160V
3
—
—
15
—
—
—
—
—
12
—
—
—
—
A8011 – Install Chiller VFD
Approved
Awarded
—
—
EP-UTL-002
—
—
4160V
3
—
—
220
—
34
—
—
VFD
—
—
—
—
—
A8020 – Install Chiller #2
Approved
Awarded
2026-04-15
—
EP-UTL-003
—
—
480V
3
—
—
75
—
105
—
—
VFD
—
—
—
—
—
A8030 – Install PCW Pumps
In Review
Pending
—
—
EP-UTL-003A
—
—
480V
3
—
—
56
—
78
—
—
—
—
—
—
—
—
A8031 – Install PCW Motor
Approved
Awarded
—
—
EP-UTL-004
—
—
480V
3
—
—
35
—
49
—
—
—
—
—
—
—
—
A8040 – Install UPW System
Pending
Draft
—
—
EP-UTL-005
—
—
480V
3
—
—
45
—
63
—
—
—
—
—
—
—
—
A8050 – Install Exhaust Scrubbers
Overdue
Pending
—
—
EP-UTL-006
—
—
480V
3
—
—
15
—
21
—
—
—
—
—
—
—
—
A8060 – Install Bulk Gas Panel
Approved
Awarded
2026-03-15
2026-05-01
5,826
3,065
5,581